Fast Turnaround! Kotare Park, Cambridge
We are stoked to announce that our most recent build in Cambridge is complete! Designed by the team at Native Bird Drafting, this build took 4 months from breaking ground to completion. A 16 week turnaround means that we can maintain our high standard of quality, while working to timeframes that suit all parties involved.This 4 bedroom home is located in one of Cambridge's newest subdivisions - Kotare Park. Clad in painted brick and axon, it has great street appeal. Inside it features a designer...
September 25, 2024Client Testimony - Mark & Meghan Maloney
"We first met Kieran in March 2021 when we were searching for a piece of land close to Cambridge where we could build our dream home. From the outset we were impressed with his professional yet laid back manner, and we fell in love with the 5,700 sqm piece of land in Maungakawa instantly with its west facing views - we were already imagining the amazing sunsets on the deck! We came with a plan already in mind for our new home, and we couldn’t believe that Resibuilt’s original plan was almost...
June 15, 2022Te Huia Subdivision, Flagstaff
This home holds a special place as it was the first house and land package ResiBuilt completed. This project was completed in July 2021 – a five month build from start to finish. Steep banks bordered two of the four boundaries on the 841 m2 section, with the remaining two boundaries being bordered by retaining walls. This required special consideration when developing the plans so the land could be best utilised. Plans were created for a stunning 235 m2 home. Once the clients had sig...
February 22, 2022 Posts 1-3 of 3 | Page